A Prepour compliance letter assures the client that the contractor has prepared the foundation in accordance with the engineering design plans. ​

While other engineers charge $200+ for this service, 3 Day Design includes the prepour letter for free with every foundation we design. 

Confirm all
Pre-Pour
Submittal Requirements

  • 24-hours is required to issue a Pre-Pour Compliance Letter.

  • Foundation Design invoice must be paid in full. (Accounting 512-845-2760)

  • Geotechnical report requirements (if provided) are fully met.

  • Minimum 4" slab thickness across the entire area.

  • Slab- dimensions, drops, offsets, etc. match the latest architectural plans.

  • Grade beams- penetration into virgin soil, locations, depths.

  • Reinforcement- size, spacing, splices, corner bars, chairs.

  • Vapor retarder- installed per manufacturer requirements

  • Hardpoints/piers- locations, depths, reinforcements.

  • Epoxy dowels- embed depth, size, locations.

  • Slab drops- proper waterproofing and full drainage systems.

  • Retaining walls- proper waterproofing and full drainage systems.